FAQ
FAQs
-
Are there any green initiatives?
The City of Plantation is implementing the following green initiative for all structures within the City: all “LEED” or “FGBC” certified GREEN buildings will be given “Fast Track Plan Review” without charge. Please check with the Building Department for further details.
-
Definitions for the Building Department?
Approved means reviewed, stamped and signed as such by the Building Department.
Revision means something on the original plan has been relocated and there was no increase in the original contract price. A new permit application is required at time of submittal.
Supplemental means something has been added to the original approved plans (i.e., switches, receptacles, equipment, etc.). A new permit application is required at time of submittal.
As Built means final version of plan for project which shall be submitted as a revision. A new permit application is required at time of submittal.
Redlined means minor changes marked on the plan in red ink, approved by Engineer or Architect of record, for permitting or prior to rough inspections with supplemental permit for approval.
-
Do burglar alarm/security systems need a permit?Effective October 1, 2013, all contractors installing burglar alarms for single family residences must obtain registration permits from the Plantation Police Department prior to installation.
-
Do I need a re-nailing inspection on a roof permit?
No, a re-nailing inspection on a roof permit is not required.
-
Frequently Asked Questions on Elevators
-
How are plans processed?
All plans/supporting documents for the Building Department will be processed electronically through the Citizen Access Portal (ACA) and must be accompanied by a new permit application. Once submitted, a revision permit number will be assigned to the application; this will be used as your tracking number as it processed thru the system.
If the plans were disapproved and after reviewing your Issues (plan review comments) and you have a question about an Issue, the Engineer/Architect can contact the Plan Reviewer. After corrections have been made and prior to re-submitting plans, the person of record who signed and sealed the plans shall review all plans for code compliance, whether on the plan review comment sheet or not. Please correct all code violations, prior to resubmitting.
-
How can a contractor register with the City of Plantation?
To register with the City of Plantation, a company must submit a current State Certified License or their State Registered License along with the Broward County Competency License, valid Certificate of Insurance for General Liability and Worker’s Compensation (must have City of Plantation listed as the certificate holder) or a valid Worker’s Compensation Exempt form.
-
How can I obtain copies of plans for my house?
To obtain copies of plans for your home, please visit the Building Department, Microfilm Division for assistance; an appointment may be required. The cost to obtain printed copies of any document is $3 per page up to 11×17; $5 per sheet larger than 11x17. A twenty-five dollar deposit will be required for any research requested and done by our office which will be completed within one week and you will be notified to pick-up your plans. You will receive a refund if your total cost is less than your deposit or if it exceeds, you will be contacted for an additional amount. Contact our office at 954-797-2783 for further information.
-
How can I remove a contractor from my job?
To remove a contractor from your job, you must submit a notarized letter from the qualifier of the permit you are removing from the job. If you cannot obtain a release letter, you must submit a Hold Harmless form signed by both the General Contractor and/or the Property Owner, along with a financial statement.
-
How can I submit a set of plans, before I have hired a contractor?
Plans may be submitted by owner, owner’s agent or architect for a preliminary review by opening up a cost recovery account with a minimum deposit of $1,000.00. Please see Preliminary Review Requirements here.
-
How do I get to Plantation’s Building Department?
If you are coming from the North:
Take I-95 South; exit on Sunrise Blvd; go West to NW 65th Avenue and make a left; then go to NW 70th Terrace and make a left. The Development Services (Building Department) is located on the right (next to the Police Department) at 401 NW 70th Terrace.
If you coming from the South:
Take I-95 North to I-595 West; exit on University Drive; go north to NW 5th Street (past Broward Blvd) and make a right; then go to 70th Terrace and make a right. The Development Services (Building Department) is located on the right (next to the Police Department) at 401 NW 70th Terrace.
or
Take I-95 North; exit on Broward Blvd; go West to NW 70th Avenue and make a right; go to NW 4th Street and make a left; then make a right on NW 70th Terrace. The Development Services (Building Department) is located on the left at 401 NW 70th Terrace. -
How do I report criminal convictions?
During the 2009 Legislative Session, the Florida Legislature passed House Bill 425, which became law on October 1, 2009. The bill requires all professional licensees to report to the department within 30 days of being convicted or found guilty of, or having plead nolo contendere or guilty to a crime in any jurisdiction.
If the conviction, finding of guilty, plea, or adjudication were entered before October 1, 2009, then the licensee must have reported by October 31, 2009. A licensee who fails to report under this new statute may be subject to disciplinary action, including fines, suspension or license revocation. This requirement appears to apply to all license holders, whether or not the license is active or inactive. The CILB Board Office has indicated that the reporting requirement does not apply to traffic infractions involving parking, speeding, inspection, or traffic signal violations.
To obtain the Criminal Self-reporting document, click here.
-
How do I schedule an inspection?
The cut-off time for next business day inspection requests is 12 noon, per Florida Building Code 110.5.
Inspections are required after obtaining permits per Florida Building Code. There are numerous types of inspections, which vary due to types of construction. If inspection requests are received by 12 noon, the inspection will be scheduled for the next business day. If inspection requests are received after 12 noon, subject inspection will be scheduled in two business days or the next available business day thereafter.
In order to schedule an inspection, you must have your permit number and your three-digit inspection code located on your permit card or you may search it on the Citizen Access Portal.
Scheduling an Inspection
To schedule an inspection, do one of the following:
- Call the automated inspection line at 954-678-2632
- Log into your account at Citizen Access Portal*
* Available for registered and activated Contractors; NOT available for Owner/Builder permits
After an inspection has been completed, an inspector will sign a permit card on the premises only when the subject inspection is approved. These permit cards shall be placed in an approved location. A disapproved inspection will constitute a $100 re-inspection fee. This fee must be paid prior to any further inspections.
Overtime Inspections
This will require a cost recovery account with a $500 minimum deposit (cash or check only) in order to set it up; fees for services will be deducted at time and a half rate, plus expenses. Please contact the Building department staff at helpmebuilding@plantation.org or 954-797-2765 for further information.
-
How do I submit changes to my plans?
Submit any revised or supplemental plans with permits at least three days prior to inspection thru ACA.
Changes of any kind to plans must be approved by the Engineer or Architect of record. The plans shall be submitted with changes clouded in. The applicable contractor must fill out the new application to submit along with this change.
Minor changes may be redlined, signed by Engineer or Architect of record and submitted to plan review prior to rough inspection only. New sets of plans must be submitted and “approved” prior to final. The office staff will not remove any plans from City files for this purpose.
After approval, the revised plans/supporting documents shall be printed and posted on the job site, along with the previously approved plans, prior to calling for inspection.
-
How long does it take to obtain a permit?
Minor permits can be issued the same day. Larger plans will take anywhere from a week to ten working days, depending upon the size of the job. See more information on Walk-Thru Permits here.
-
If my plans are denied, do I have to come into the office to get the plan review comments?
No, once the plan review has been completed where additional information is required for approval, an e-mail will be sent to the applicant as notification. You can also go online to the ACA (Accela Citizen Access) portal to view the Plan Review Comments; found under attachments. Please note, you do not need to be a registered/active user to utilize the site.
Note: Any corrections required to address plan review comments in order to resubmit plans will be accepted only when the plan review has been completed by all disciplines and the permit is in Hold status
-
Is there expedited permitting and land development process for affordable housing projects?
The City of Plantation had previously committed to implementing an expedited process for building permit review and issuance for Affordable/Attainable/Workforce housing (“AH”) projects as an incentive for AH developers to build housing stock in the City. To date, the City has not yet had to implement the policy/commitment, due a lack of AH developers coming forward.
In 2022, the Affordable Housing Advisory Committee (AHAC) and City Council approved as an AH incentive, the establishment of an EXPEDITED PERMITTING process, which will include an expedited land development approval process as well. The incentive was brought back to the AHAC on March 2, 2023, for further discussion and ideas and again with this memorandum to their May 4 meeting for final approval.
The City’s Building Department is able to review most permits within a reasonable timeframe, with the disciplines of Electrical, Mechanical, Plumbing and Structural typically reviewing a specific permit within the timeframe required by the Florida Building Code (FBC), depending on the workload of applications and inspections, but normally soon after the permit application is distributed once it is deemed a complete application (i.e., when all of the required forms, documents and plans have been submitted is therefore determined by one of the City’s Permit Analysts to be a complete submission). The other disciplines which are outside of the Building Department, including Engineering, Fire, Public Works (Landscaping Division), Utilities, and Zoning, vary in the timeframes that it takes their Staff to review a permit application. In addition, the City does not have any control over the time that it takes an applicant to submit, or resubmit, nor does it have any control on how long any outside review agency, such as Broward County or a drainage district, may take in reviewing any projects.
Most projects that involve the proposed construction of one or more buildings are reviewed about 2 or 3 times, sometimes more, depending on the ability of the project architects-of-record and engineers-of-record to address the written plan review comments made by Staff Plan Reviewers.
CRITERIA
Staff is committed to ensure that projects that contain an AH component receive a special designation and are established to be reviewed for conformance with codes and approved plans ahead of all other types of permits. However, there needs to be a set of criteria in order to designate such projects for expedited review and processing:• Projects that include at least 15% of the dwelling units as committed to provide owned or rented housing units for residents from extremely-low, very-low, low, and moderate income levels, shall qualify for the incentive of Expedited Permitting.
STEPS
The Development Review process starts from the initial contact with the City about a proposal through to the issuance of a Certificate of Occupancy (CO). Once a prospective applicant reaches out to the City about a proposed project, they are asked to file for a Pre-Development Review meeting, a virtual meeting which involves all of the disciplines that review plans as members of the Development Review Committee {DRC).
The prospective applicant and their design professionals are given about 45 minutes to introduce and explain their project and obtain feedback and comments from each discipline. Subsequently, “Prospective Applicants” become “Applicants” when their design team officially submits their application documents and plans into our Accela electronic permitting review system. The plans are distributed to the DRC members simultaneously, who then review and comment and then the project is discussed at a specified, regularly scheduled DRC meeting. Currently, most projects are reviewed twice by DRC, and then a third submittal is made for the Planning & Zoning Board {PZB) public hearing. After the PZB hearing, the applicant will address any comments that the PZB may have made and resubmit a fourth time for City Council consideration at their next regularly scheduled public hearing at which the project may obtain final approval for the site plan, which encompasses the site, architectural and landscaping design. Normally, this process takes about 4-8 months {excluding the Pre-Development meeting, and starting from the time of official submittal to the final public hearing). It will take longer if a Plat and/or a Land Use Plan Amendment (LUPA) is required, since those processes also involve Broward County Staff review and public hearings.
Subsequent to obtaining Final Site Plan approval by the Council, the applicant will then submit for the appropriate building, engineering, landscaping and zoning permits in order to begin construction of the project. Normally, the issuance of a building permit for one or more buildings takes anywhere from 3-9 months, depending on complexity of the project/plans and the workload of Staff, which encompasses at least two (2) full reviews of the plans (i.e., by every discipline).
The construction process of such projects normally takes anywhere from 6 months to about two (2) years, depending on the complexity and scope of the project. This timeframe is largely dependent on the applicant, their construction team, delivery of materials and the response time of the financing institutions that are involved. Consequently, the total timeframe for construction of a project from the first point of contact with the City of Plantation to the final inspection and issuance of COs can take anywhere from 1.5-3 years.
HOW CAN THE CITY HELP?
The City can help shorten the timeframe for AH projects by (1) overlapping some of these processes and therefore reducing the overall timeframe; and (2) by earmarking Staff resources for special attention for such projects once they are officially submitted.
Once a project is determined to meet the criteria for providing some or all of its units as meeting the Affordable Housing definitions {as noted above), it will be assigned a Staff member who will act as a
“Concierge” to help guide them through all steps in the process and to ensure that the City is responding to their questions, needs and concerns in a timely manner.Such projects will be able to obtain:
• Priority scheduling for Pre-Dev, DRC, PZB, and City Council with an allowance of up to 10 calendar days for a deadline extension that other applicants will not be able to obtain
• Priority scheduling for Pre-Construction meetings with Building, Engineering and PZED Staff
• One (1) DRC meeting instead of the normal two (2), followed by PZB and City Council {the latter will require that all DRC comments are addressed) {this step could save 4-8 weeks}
• Priority for assignment of Flexibility, Reserve and Bonus Density units over projects that do not incorporate at least 15% AH
• The ability to submit for building, engineering, landscaping and zoning permits BEFORE final approval by the City Council {at their own risk should the project not obtain such approval) once it is
determined that the plans will not change in a significant manner between DRC/PZB review and Council {this step could save 4-8 weeks}
• The initial review process during the permitting stage would be fast-tracked over all other submittals received during that week.
• All subsequent reviews would also be fast-tracked over all other submittals received during that week.Additional incentives:
• If a project involves renovation of existing buildings to convert them into AH without expansion or up to a 25% expansion of building(s) of such a property, and the property does not require any Waivers,
Rezoning or LUPA, then it may be approved Administratively by the DRC once all DRC comments are satisfied {in this case, it would take two reviews, not one).
• If the project involves demolition of existing buildings and new construction or new construction on vacant land, and at least 50% of the units will meet AH criteria, and the property does not require any
Waivers, Rezoning or LUPA, then the applicant may be approved Administratively by the DRC once all DRC comments are satisfied {in this case, it would take two reviews, not one).CONSIDERATIONS
• The onus will be on the applicant to notify the City in writing of their intent to incorporate AH into their project and to notify the City about their status during every step in the process, their applications
and receipt for public funding sources and the dates for which they plan to submit for the DRC, Board/Council and permitting processes. In this way, Staff can be most effective in alerting relevant
parties and ensuring a smooth process.
• Expedited permitting requires AH developments to be placed ahead of other development and construction projects- this may result in tension with other developers, business owners and residents
whose projects are put behind theirs as a result.Thank you for your consideration.
-
Must I submit a Notice of Commencement at the time I submit my permit?
No, a certified copy of the Notice of Commencement for jobs with an estimated value over $2,500, or $7,500 for A/C replacements, is not required at time of application/permit submittal. However, it should be submitted at time of permit issuance or prior to the obtaining your first inspection.
-
What are the construction hours for contractors, property owners and developers?
The hours for standard Construction activity are as follows:
- Monday – Friday: 7 a.m. – 8 p.m.
- Saturday: 7 a.m. – 8 p.m.
- Pile-driving Hours: 8 a.m. – 5:30 p.m.
No work shall be performed on Sunday or a holiday, per City ordinance Chapter 16, Sec 16-2.
-
What is the difference between a Preliminary Review and Fast Track Plan Review?
A preliminary review is when plans are submitted without a signed contract or a contractor and/or sub-contractors has not been selected (project still out to bid). Fast track plan review is when a contractor has been selected and the contractor has a signed contract and has all sub-contractors permits and contracts. Plans submitted under Fast Track plan review will be given first priority. Fast Track plan review requires a cost recovery account.
-
What is your fax number?
- Contractor Registration: 954-797-2270
- Permit Counter/Plan Review: 954-797-2273
-
When does the city require a permit?
FBC 105.1 (Broward County Amendments) – Any owner or authorized agent who intends to construct, enlarge, alter, repair, move, remove, demolish, or to change the occupancy of any building, structure, or to erect, install, enlarge, alter, repair, remove, convert or replace any impact-resistant coverings, electrical, gas, mechanical or plumbing system, the installation of which is regulated by this Code, or to cause any such work to be done; shall first make application to the Building Official and/or Fire Code Official as indicated in FFPC or a duly authorized representative and obtain the required permits.
-
When is a permit not required?
Please contact the appropriate Building Department Division Chief for information:
- Structural: 954-797-2782
- Electrical: 954-797-2264
- Mechanical: 954-797-2787
- Plumbing: 954-797-2784
-
When shall I get my plans reviewed and approved by the Development & Environmental Regulations Section?
Permits for a new residential or commercial building, additions to commercial buildings, or any change of use in commercial properties require that plans be submitted to the following before they are submitted to the local Building Department:
Development and Environmental Regulations Section
Permitting and Planning
1 N University Dr Suite 102
Plantation, FL 33317
954-357-6666 -
Who handles the construction and debris removal?Under the City’s franchise ordinance, ONLY franchised firms may collect C&D within the City. For additional details and a list of the authorized firms, click here.
-
Why should a contract need to be submitted with the permit application?
The permit fees are based on the estimated value of the job and the contract shows the scope of work and cost of job. The contract also indicates that the owner of the property has hired a particular contractor.