NOTE: The information provided below is just a guide to facilitate in the calculation of permit fees; additional fees may apply. Please see the City Ordinance for complete details.
Minimum Fee: All Divisions – $75. 00, Except where noted
| New Construction – Residential |
Structural plus
Fire Fee |
0.7% x RSM of Total Project Cost
0.3% x RSM of Total Project Cost |
Electrical plus
Fire Fee (when applicable) |
0.3% x RSM of Total Project Cost
0.3% x RSM of Total Project Cost |
| Plumbing |
0.23% x RSM of Total Project Cost |
| Mechanical |
0.14% x RSM of Total Project Cost |
| Certificate of Occupancy |
$100.00 |
| Building Code Surcharge Fees |
3% of Permit fee |
| Engineering Fee |
$75.00 |
| Broward County Tax |
$0.60 per $1,000 of Est. Cost |
| Certification & Maintenance Fees |
$0.20 per $1,000 of Est. Cost |
| Administrative/Overhead Surcharge – Applicable to all permits |
2.5% of Permit fee |
| Roof Permit & Replacement Mechanical |
1% up to and including the first $4,000; plus 1.5% of Est. Cost in excess of $4,000 |
| Storm Shutters |
1.5% of Est. Cost |
| Driveways |
1.5% of Est. Cost |
Burglar Alarms, Lawn Sprinkler,
Central Vacuum [Electrical & Mechanical (each)] |
5% of first $20,000 of Est. Cost
4% of $20,001 to $50,000 plus
3% of $50,001 to $100,000 plus
2% of $100,001 to $150,000 plus
1% of $150,001 to $1,000,000 plus
0.5% of any amount over $1,000,001 x RSM |
| Supplemental Permits (All Divisions) |
Based on Residential Fees with $75.00 minimum |
| Revisions |
$75.00 minimum |
| Pool/Spa (Combo Permit) |
1.5% of Est. Cost
Electrical, Mechanical and Plumbing based on Residential Fee with $75.00 minimum (each application) |
Paving, Striping Permit plus
Fire Fee |
5% of Est. Cost
0.3% x RSM |
| Drainage Permits |
5% of Est. Cost |
| New Construction – Non-Residential |
Structural plus
Fire Fee |
0.7% x RSM of Total Project Cost
0.3% x RSM of Total Project Cost |
| Electrical, Plumbing, Mechanical (the fees scheduled given to the right; dollar values refer to the specific contract) |
5% of first $20,000 of Est. Cost
4% of $20,001 to $50,000 plus
3% of $50,001 to $100,000 plus
2% of $100,001 to $150,000 plus
1% of $150,001 to $1,000,000 plus
0.5% of any amount over $1,000,001 x RSM |
| Certificate of Occupancy |
$100.00 |
| Building Code Surcharge Fees |
3% of Permit fee |
| Engineering Fee |
$75.00 |
| Broward County Tax |
$0.60 per $1,000 of Est. Cost |
| Certification & Maintenance Fees |
$0.20 per $1,000 of Est. Cost |
| Administrative/Overhead Surcharge – Applicable to all permits |
2.5% of Permit fee |
| Roof Permit & Replacement Mechanical |
1% up to and including the first $4,000; plus 1.5% of Est. Cost in excess of $4,000 |
| Storm Shutters |
1.5% of Est. Cost |
| Burglar Alarms, Intercom/Music, etc. |
Fees are based on specific contract amount, Schedule is the same as stated above for Electric, Plumbing, Mechanical + Fire Fee (0.3% x RSM , if applicable) |
| Fire Alarm, Fire Sprinklers and/or any life safety systems* |
Schedule is the same as stated above for Electric, Plumbing & Mechanical |
| Revisions |
$75.00 minimum |
Paving, Striping Permit plus
Fire Fee |
5% of Est. Cost
0.3% x RSM |
| Drainage Permits |
5% of Est. Cost |
* Life safety systems include the following: Fire sprinkler, standpipe, and fire pumps, fire alarm, smoke control and exhaust, duct detectors, dampers (for smoke control and exhaust systems), generators, emergency lights and exit signs, hood and hood suppression systems, other type suppression systems, explosives storage and containment and facilities, fuel lines and fuel storage tanks, means of egress (doors and windows), automatic gate systems, etc., and all system appurtenances and building appurtenances which the fire chief or his designee reasonably determine to be life safety systems.
NON-RESIDENTIAL ADDITION/INTERIOR COMPLETION/ALTERATION
Fee Schedule is based the same as New Non-Residential Construction, minus fees for Engineering, Roofing, Storm Shutters, Paving and Drainage. Broward County tax, Building Code Surcharge Fees, Certification & Maintenance fees and Administrative/Overhead Surcharge will be assessed to all permits.
RESIDENTIAL ADDITION/ALTERATION
Fee Schedule is based the same as New Non-Residential Construction, minus fees for Engineering, Roofing, Storm Shutters, Paving and Drainage. Broward County tax, Building Code Surcharge Fees, Certification & Maintenance fees and Administrative/Overhead Surcharge will be assessed to all permits (certain exceptions may apply).
MISCELLANEOUS PERMITS
1.5% of Est. Cost with $75.00 minimum.
PROCESSING APPLICATION FEES
Processing fees are charged as follows: $20 for the first page of plans and $10 for each additional page.
There is NO CHARGE for:
-
Product Approvals
-
Surveys
-
Site Plans
-
Manufacturers Specifications
NOTE: The information provided above is just a guide to facilitate in the calculation of permit fees; additional fees may apply. Please see the City Ordinance for complete details.
|